Every year, Danish municipalities, regions and state agencies spend billions of kroner on schools, hospitals, roads, bridges and housing. Almost all of that work is bought through a public tender. If you are a contractor, a subcontractor or a building product supplier, understanding how those tenders work is the first step to winning a share of it.
The rules can look complicated at first. Two different laws apply, depending on the size of the project. There are several ways a tender can be run. And the documents use terms like ESPD, prækvalifikation and standstill that are rarely explained in plain language.
This guide walks you through it, step by step. You will learn:
- Which laws apply, and where the value limits are in 2026
- The main tender procedures used for construction work
- Where Danish construction tenders are published
- What happens from the day a tender is announced until the contract is signed
- Real examples from recent Danish projects
- Why the companies that win most often start working long before the tender is published
The rules: two laws, one dividing line
Which rules apply to a Danish construction tender depends on one thing: the estimated value of the contract, excluding VAT.
Udbudsloven (the Public Procurement Act) came into force on 1 January 2016. It is Denmark’s version of the EU procurement directives. It applies to contracts at or above the EU threshold, and it sets the rules for selecting suppliers, evaluating bids and dividing contracts into lots (DI Byggeri).
Tilbudsloven (the Tender Act) covers construction work below the EU threshold. These limits are set nationally by Denmark, not by the EU (Folketinget).
The value limits in 2026 and 2027
The EU threshold is reviewed every two years. From 1 January 2026, it is DKK 40,313,840 for building and construction works. The same figure applies to utilities and concession contracts (Konkurrence- og Forbrugerstyrelsen).
| Contract value (excl. VAT) | Law | What the buyer must do |
|---|---|---|
| Under DKK 300,000 | No tender rule | The buyer can ask a single company for a quote |
| DKK 300,000 to 3 million | Tilbudsloven | Ask for quotes (underhåndsbud) or hold a licitation. Normally 3 quotes, or 4 if one comes from outside the local area |
| DKK 3 million to 40.3 million | Tilbudsloven | Hold a public or restricted licitation |
| DKK 40.3 million and above | Udbudsloven | Run an EU tender, published in the EU’s TED database |
Source: DI Byggeri and KFST
Two details matter in practice. First, the buyer must add up the whole project to decide which law applies. A large project split into trade packages is still judged on its total value. Second, under the EU rules, smaller lots of up to DKK 7,460,000 can sometimes be handled outside the full EU procedure, even when the project as a whole is above the threshold (KFST).
What this means for you: most municipal school extensions, renovations and road jobs fall under Tilbudsloven. Hospitals, large infrastructure and major housing schemes usually go to EU tender.
Heads-up: Tilbudsloven is likely to be abolished
The rules above are the ones in force today, but a big change is on its way. A first bill to repeal Tilbudsloven (L 113) lapsed when the general election was called in March 2026 (Folketinget). The government reintroduced it as L 11 on 7 October 2026. Parliament held the first reading on 23 October, and the bill is now in committee (RetsNyt).
L 11 is a reintroduction of the earlier bill. Under that version, construction work below the EU threshold would move into Udbudsloven (L 113 as proposed):
- Contracts of clear interest to foreign bidders would have to be advertised. Contracts of DKK 100,000 or more would go on udbud.dk.
- Other contracts of DKK 5 million or more would require the buyer to get at least three bids or advertise on udbud.dk.
- Other contracts under DKK 5 million would only need to be bought “on market terms”. The familiar licitation and underhåndsbud rules would disappear.
- Non-state buyers would have to include pay and working-conditions clauses in construction contracts above the EU threshold.
The earlier version would have applied from 1 January 2027. The final wording and start date depend on what Parliament passes, and we will update this guide when it does.
The main tender procedures in construction
The procedure decides who is allowed to bid and how many rounds there are. You will see these names in the tender notice, so it pays to know them.
Under Udbudsloven (EU tenders)
The law lists several procedures. In construction, four are used most often (KFST guidance on Udbudsloven).
| Procedure | Who can bid | Phases | Typical use |
|---|---|---|---|
| Offentligt udbud (open procedure) |
Anyone who meets the minimum requirements | One: you submit your qualifications and your bid together | Standard building and civil works with a clear design |
| Begrænset udbud (restricted procedure) |
Only companies that are prequalified | Two: application, then bid | Larger projects where the buyer wants a shortlist |
| Udbud med forhandling (competitive procedure with negotiation) |
Prequalified companies | Application, bid, then negotiation and a revised bid | Projects where the solution needs adjusting with bidders |
| Konkurrencepræget dialog (competitive dialogue) |
Prequalified companies | Application, dialogue on solutions, then final bid | Very complex projects, such as large infrastructure or PPPs |
Copenhagen Municipality, one of Denmark’s biggest buyers, says it mostly uses the open or restricted procedure for its EU tenders. The two negotiation-based procedures are known as the flexible procedures, because bidders can submit revised bids after negotiation rounds (Københavns Kommune).
Under Tilbudsloven (below the EU threshold)
In construction, a tender is often called a licitation. The word means the same as udbud but is traditionally used for building work (Region Nordjylland). The main forms are:
- Offentlig licitation: open to all interested companies.
- Begrænset licitation med prækvalifikation: companies apply, and the buyer picks who may bid.
- Begrænset licitation uden prækvalifikation (also called indbudt licitation): the buyer invites a small group of companies directly.
- Underhåndsbud: an informal request for quotes, allowed for work up to DKK 3 million.
Tip: many municipalities keep a list of approved tradespeople and contractors for jobs under DKK 3 million. Skanderborg and Hørsholm both require companies to register before they can be invited to quote (Skanderborg Kommune, Hørsholm Kommune). If you want smaller local work, getting on these lists is an easy first step.
Step by step: from tender notice to signed contract
The exact steps depend on the procedure, but most EU construction tenders follow this order.
- The tender notice is published. It appears on TED and udbud.dk, with a link to the full tender documents. Under Udbudsloven, the buyer must publish all the documents at the same time as the notice, including how bids will be evaluated (TEKNIQ).
- You read the documents and decide whether to bid. Check the minimum requirements, the deadline, the contract model and the award criteria. This bid/no-bid decision is where many companies save or waste the most time.
- You ask questions. Buyers set a deadline for questions and publish all answers to every bidder. Answers become part of the tender material, so read them carefully.
- You fill in the ESPD. The ESPD (European Single Procurement Document) is a self-declaration. It covers whether you meet the exclusion grounds and the requirements for financial and technical capacity, such as turnover and references. As a rule, only the winning bidder must later prove that the information is correct (Dansk Erhverv). You can reuse an ESPD from an earlier tender if you confirm the details are still correct (Udbudsloven, chapter 12).
- Prequalification (restricted procedures only). You apply first. The buyer then picks a shortlist of companies who may bid, often based on references and financial strength.
- You submit your bid. This is usually done in the buyer’s e-tendering system before a fixed deadline. Late bids are rejected.
- The buyer evaluates the bids. Udbudsloven allows three award criteria: price, cost (for example, including lifecycle costs), or the best price-quality ratio. With the last option, quality sub-criteria can include technical value, environmental and social factors, the team’s experience, and service and delivery terms (Udbudsloven § 162). For construction contracts above DKK 350 million that use price-quality, the buyer must assess quality without knowing the prices (DLA Piper).
- The award decision and the standstill period. All bidders are told who won and why. The buyer must then wait at least 10 calendar days before signing, if notice was given electronically. During this standstill period, losing bidders can complain to Klagenævnet for Udbud (the Complaints Board for Public Procurement) (Lov om Klagenævnet for Udbud § 3).
- The contract is signed. Most Danish public construction contracts use AB 18, the standard general conditions for building and construction work. It is not a law but an agreed document, and the Danish Building and Property Agency advises public clients to use it without changes (DI Byggeri). In practice, many buyers add their own changes, so always read the special conditions.
Tip: price still decides a lot. A 2025 analysis by the Danish Competition and Consumer Authority found that many tenders are decided on lowest price alone, and that more tenders now receive only one bid (DI). Read the award criteria before you price, so you know where your effort counts.
Real-world examples from Danish projects
These projects show how the rules play out in practice, and what each one teaches a bidder.
1. Storstrømsbroen: competitive dialogue on a mega-project
The new Storstrøm Bridge links Zealand and Falster via Masnedø. The Danish Road Directorate (Vejdirektoratet) ran the construction tender as a competitive dialogue. It prequalified five consortia, and four submitted bids in July 2017 (Ingeniøren, Folketinget). An Italian consortium of Itinera, Condotte and Grandi Lavori Fincosit won with a bid of about DKK 2.06 billion (Ingeniøren).
Signing was delayed when one partner, Condotte, ran into financial trouble. The Directorate asked the consortium to document its finances before it would sign (Ingeniøren).
Lesson: on the largest projects, the shortlist is decided long before bids are priced, and your financial strength is checked again before signing. Consortium partners need to be solid, not just big names.
2. Nyt Hospital Nordsjælland: one big win, many smaller tenders
Region Hovedstaden’s new hospital in Hillerød is about 122,000 m² (NCC job listing). NCC won the first contract in 2019 (Sjællandske). Phase 1 covered site preparation and groundworks, and NCC was also made responsible for tendering and buying the later trade packages for facades, roof and interior fit-out (NCC press release). In December 2021, NCC and the region signed the next phase, the building envelope, worth DKK 475 million (NCC press release).
Lesson: a public tender does not always end with the public buyer. On many large projects, the winning contractor runs its own tenders for subcontractors and suppliers. If you sell facades, roofing or fit-out, your real customer may be the main contractor, and you need to know who that is early.
3. Nyt Aalborg Universitetshospital: split into trade contracts
The new university hospital in Aalborg was tendered partly as separate trade contracts (fagentrepriser). One EU award notice covered 10 trade contracts, including interior fit-out, electrical, plumbing, sprinklers, facades, and steel and roof work (TED notice 115152-2020).
Lesson: splitting a large project into trade packages opens the door to specialist firms that could never bid for the whole hospital. Watch for these packages on TED.
4. A municipal daycare: a classic Tilbudsloven licitation
In 2013, Viborg Municipality held a public licitation under Tilbudsloven for a new daycare in Bjerringbro. The job was split into 11 trade contracts, and the award criterion was lowest price. The carpentry package alone drew seven bids, and the lowest was DKK 4,098,000 (Klagenævnet for Udbud).
Lesson: smaller municipal projects often attract many bidders and are decided on price. Winning these is about efficient estimating and a lean bid process.
Why the real sale starts before the tender is published
The tender rules are designed to give every bidder equal access to the same information at the same time. That is fair, but it also means that once the notice is out, everyone is starting from the same line, and the deadline is already running.
The companies that win most often have usually done three things before that day:
- They knew the project existed. Projects show up in council minutes, local plans, budget decisions and architects’ portfolios long before they reach udbud.dk or TED.
- They talked to the people shaping it. Architects, engineers and client advisers write the specifications. A supplier who explains its product early has a better chance of meeting, or helping define, the technical requirements. Under Udbudsloven § 42, buyers generally may not name a specific brand or make. When they exceptionally do, it must normally be followed by the words “or equivalent” (current § 42, as described in L 113). So the goal is to shape performance requirements, not to get a brand written in.
- They planned their capacity. With weeks of notice instead of days, they could line up staff, partners and references, and decide calmly whether to bid.
The Nyt Hospital Nordsjælland example shows why this matters even more for suppliers and subcontractors. The public tender picks a main contractor, but many of the purchasing decisions that follow are made by that contractor, on its own timeline.
How Northern Globe helps
Northern Globe tracks upcoming building and construction projects across Northern Europe, often before tenders are officially published. Our researchers carry out thousands of interviews every week to verify each project and find the right contacts: architects, consultants, contractors and client teams.
- See how it works
- Learn who we are
- Request a demo and see upcoming projects in your sector
Frequently asked questions
When does a construction project in Denmark have to go to EU tender?
When the estimated contract value, excluding VAT, is DKK 40,313,840 or more. This threshold applies in 2026 and 2027.
What is the difference between Udbudsloven and Tilbudsloven?
Udbudsloven covers contracts at or above the EU threshold and follows the EU directives. Tilbudsloven covers construction work below the threshold, with national rules on licitations and underhåndsbud. The government plans to merge the two by repealing Tilbudsloven.
Is Tilbudsloven being abolished?
Very likely. The government reintroduced a bill to repeal it (L 11) on 7 October 2026, and it is now in committee. Until the new law is passed and takes effect, Tilbudsloven still applies.
Where can I find Danish construction tenders?
On udbud.dk for Danish notices and on TED for EU tenders. The documents are usually hosted in an e-tendering system such as EU-Supply or Mercell.
What is an ESPD?
The European Single Procurement Document. It is a self-declaration where you confirm that you are not excluded and that you meet the buyer’s financial and technical requirements. Usually only the winner must later provide proof.
What is the standstill period?
After the award decision, the buyer must wait at least 10 calendar days (if notified electronically) before signing the contract. Losing bidders can complain to Klagenævnet for Udbud during this time.
Do I have to be the cheapest to win?
Not always. Buyers can award on price, cost, or the best price-quality ratio. Many Danish tenders are still decided on lowest price alone, so read the award criteria before you price your bid.
What is AB 18?
The standard general conditions for building and construction work in Denmark. Most public construction contracts are based on it, often with the buyer’s own changes.